tencent cloud

Data Transfer Service

Batch Operations

Download
Mode fokus
Ukuran font
Terakhir diperbarui: 2026-07-20 14:59:58
Diterjemahkan oleh AI



You can perform batch operations on migration tasks, including starting, ending, deleting, terminating, and modifying configurations.
Batch start: After completing the check task, users can start tasks in batches on the data migration page.
Batch end: After migration tasks are started, users can end tasks in batches if needed.
Batch delete: Once deleted, tasks are permanently removed, and their associated resources are cleared.
Batch terminate: Users can terminate completed or failed tasks in batches if they are no longer needed.
Batch configuration change: For tasks that require specification adjustments, users can modify the task specifications in batches to a unified specification.

Operation Steps

Batch Start/End/Delete/Terminate

1. Log in to the Data Transfer Service (DTS) console, select Data Migration in the left sidebar, batch select the specified tasks, and then choose More > Batch Start, More > Batch End, More > Batch Delete, or More > Batch Termination.
Note:
This document uses batch termination as an example for illustration.
2. In the pop-up dialog box, click OK.

Batch Configuration Change

1. Log in to the Data Transfer Service (DTS) console, select the Data Migration page in the left sidebar, batch select the specified tasks, and then choose More > Batch Configuration Change on the page.
2. In the Select Target Configuration dialog box, select the task specifications that require configuration modification, and then click Next.
3. In the Cost Details dialog box, confirm the billing information, and then click OK.
Note:
For details on the change fees, see Configuration Change Description.

Bantuan dan Dukungan

Apakah halaman ini membantu?

masukan