Scenarios
You can perform batch operations on sync tasks, including starting, ending, deleting, terminating/returning, and modifying configurations.
Batch start: After completing the check task, users can start tasks in batches on the data synchronization page.
Batch end: After synchronization tasks are started, users can end tasks in batches if needed.
Batch delete: Once deleted, tasks are permanently removed, and their associated resources are cleared.
Batch termination/return: Users can terminate ended or failed tasks in batches if they are no longer needed. Users can return yearly/monthly subscription tasks in batches if they are no longer used.
Batch configuration change: For tasks that require specification adjustments, users can modify the task specifications in batches to a unified specification.
Operation Steps
Batch Start/End/Delete/Terminate/Return
1. Log in to the Data Transfer Service (DTS) console, select the Data Sync page in the left sidebar, select the specified tasks in batches, and choose More > Batch Start, More > Batch End, More > Batch Delete, or More > Batch Terminate/Return. Note:
This document uses batch end as an example for illustration.
2. In the pop-up dialog box, click OK.
Batch Configuration Change
1. Log in to the Data Transfer Service (DTS) console, select the Data Sync page in the left sidebar, batch select the specified tasks, and then choose More > Batch Configuration Change on the page. 2. In the Select Target Configuration dialog box, select the task specifications that require configuration modification, and then click Next.
3. In the Cost Details dialog box, confirm the billing information, and then click OK.